Working directly for the GC, Holder Construction, CriticalArc provided hands-on support for Level 1 through Level 3 commissioning for a hyperscale data center located in the Tahoe Reno Industrial Complex. Primarily focused on electrical, mechanical, and low-voltage systems, this process involved heavy coordination with the trades to ensure systems were fully integrated and operational in preparation for Level 4 commissioning.
In addition, CriticalArc was brought back in 2022 to assist with reprogramming the Central Utility Plant’s BMS control operational sequences.