PORTFOLIO

BUILDING

PROJECT DETAILS

  • Client: Panasonic Energy North America (PENA)
  • Project: Gigafactory 1
  • Location: Sparks, Nevada
  • Square Feet: 4.9M
  • Construction Volume: $250M
  • Category: Private, Manufacturing, Staff Support

ABOUT THIS PROJECT

CriticalArc was brought aboard to be the utility acceptance team in order to validate and accept utilities on behalf of Panasonic prior to entering battery cell production on new tool lines. The scope of work included validating that compressed air and dry air were within dew point and flowrate specifications, fire alarm systems were functional and reporting, and forming gas volume and purity were within tolerance using various test instruments and methods.

 

Image Credit: electrek.co