PORTFOLIO
BUILDING
PROJECT DETAILS
ABOUT THIS PROJECT
CriticalArc has been tasked to provide commissioning services from the design phase through turnover for the replacement of all existing moving walkways, new moving walkways, escalators, basement geared traction passenger elevators, hydraulic passenger elevators, and hydraulic freight elevators within Phoenix Sky Harbor Airport’s Terminal 4. The project duration spans from quarter 1 of 2024 through the end of 2026.
Image Credit: gannettfleming.com