PORTFOLIO

BUILDING

PROJECT DETAILS

  • Client: Confidential Client
  • Project: Mustang-STY
  • Location: Sparks, Nevada
  • Square Feet: 290K
  • Construction Volume: $600M
  • Category: Private, Mission Critical, Staff Support, Commissioning

ABOUT THIS PROJECT

Working directly for the GC, CriticalArc is providing hands-on support for Level 1 through Level 3 commissioning.  Primarily focused on electrical, mechanical, and low-voltage systems, this process involved heavy coordination with the trades to ensure systems were fully integrated and operational in preparation for Level 4 commissioning.  The Mustang – STY project is the first 30MW phase of a planned 600MW Data Center Facility located in the Tahoe Reno Industrial Complex.

 

In addition, CriticalArc was brought back in 2022 to assist with reprogramming the Central Utility Plant’s BMS control operational sequences.