PROJECT DETAILS

  • Client: City of Phoenix
  • Project: Terminal 4 Horizontal & Vertical Conveyance Upgrade
  • Location: Phoenix, Arizona
  • Square Feet: 3.9M
  • Construction Volume: N/A
  • Category: Public, Aviation, Commissioning

ABOUT THIS PROJECT

CriticalArc has been tasked to provide commissioning services from the design phase through turnover for the replacement of all existing moving walkways, new moving walkways, escalators, basement geared traction passenger elevators, hydraulic passenger elevators, and hydraulic freight elevators within Phoenix Sky Harbor Airport’s Terminal 4. The project duration spans from quarter 1 of 2024 through the end of 2026.

 